PENGUKURAN KINERJA PADA MESIN PUNCH HOLE MENGGUNAKAN METODE OVERALL EQUIPMENT EFECTIVENESS (OEE) PADA DI PT.XYZ
DOI:
https://doi.org/10.34125/jkps.v11i3.3281Keywords:
Performance Measurement, Punch Hole Machine, Overall Equipment EffectivenessAbstract
This study aims to evaluate the effectiveness of the Punch Hole machine at PT. XYZ using the Overall Equipment Effectiveness (OEE) method, identify the factors causing performance losses through the Six Big Losses analysis, and propose improvement strategies. A descriptive quantitative approach was employed using operational data from January to December 2025, including operating time, downtime, production output, and defective products. Data were collected through observation, interviews, and documentation, then analyzed using the OEE indicators (Availability, Performance, and Quality), followed by Six Big Losses and Fishbone Diagram analyses. The results indicate that the OEE value of the Punch Hole machine ranged from 41% to 63%, which is below the world-class standard of 85%. The dominant factors reducing machine effectiveness were Reduced Speed Losses (35%) and Equipment Failure Losses (12%). The Fishbone Diagram revealed that the primary causes originated from machine, method, and material factors. The novelty of this study lies in integrating OEE, Six Big Losses, and Fishbone Diagram analyses to develop a preventive maintenance strategy for improving machine effectiveness and production productivity.
References
Ardiansyah, M. R., & Nuriyanto. (2025). Analisis Total Productive Maintenance (TPM) dengan menggunakan metode Overall Equipment Effectiveness (OEE) pada mesin blowing. Jurnal Teknik Industri Terintegrasi, 8(3), 3250–3259. https://doi.org/10.31004/jutin.v8i3.47869
De Fretes, R. A. (2022). Analysis of the causes of transformer damage using the RCA method (Fishbone Diagram and 5-Why Analysis) at PT. PLN (Persero) Kiandarat Service Office. Agustus, 16(2).
Deliana, E. H., Jazuli, & Maharani, T. (2024). Analisis efektivitas mesin produksi pada Konveksi Putra Jaya menggunakan pendekatan Overall Equipment Effectiveness (OEE). Integrasi: Jurnal Ilmiah Teknik Industri, 9(2), 113–123. https://doi.org/10.32502/integrasi.v9i2.190
Gani, S. A. (2026). Upaya meminimalisir waktu delay pada workstation bagging storage menggunakan Root Cause Analysis di PT Pupuk Iskandar Muda. Jurnal Industri, 4(1), 593–599.
Kirana, A. T., & Widiasih, W. (2024). Analisis perhitungan Overall Equipment Effectiveness (OEE) untuk meningkatkan efisiensi mesin Haloong (Studi kasus: PT Benteng Api Technic, Gresik). Jurnal Tekstil: Jurnal Keilmuan dan Aplikasi Bidang Tekstil dan Manajemen Industri, 7(1), 59–68. https://doi.org/10.59432/jute.v7i1.89
Purnomo, R. (2019). Analisis penerapan Total Productive Maintenance (TPM) menggunakan Overall Equipment Effectiveness (OEE) di PT Perkebunan Nusantara VI Ophir. Jurnal Teknik Industri, 3(1), 360–368.
Putera, R. D., Rahmawati, D. A., & Akhmad Yani, A. R. S. P. (2025). Total Productive Maintenance pada mesin press paving block: Analisis OEE, Six Big Losses, dan FMEA. Jurnal Teknologi dan Manajemen Industri Terapan, 4(3), 671–685. https://doi.org/10.55826/jtmit.v4i3.860
Risdiyanto, E., & Triana, N. E. (2023). Evaluasi penerapan Total Productive Maintenance pada mesin slitting di perusahaan pipa baja. Jurnal PASTI (Penelitian dan Aplikasi Sistem dan Teknik Industri), 17(3), 296. https://doi.org/10.22441/pasti.2023.v17i3.002
Triwardani, D. H., Rahman, A., & Tantrika, C. F. M. (2013). Analisis Overall Equipment Effectiveness (OEE) dalam meminimalisasi Six Big Losses pada mesin produksi Dual Filters DD07. Jurnal Rekayasa dan Manajemen Sistem Industri, 1(2), 379–391.
Wahid, A., Munir, M., Misbah, A., & Pusakaningwati, A. (2022). Mengukur efektivitas mesin Chenyueh menggunakan Overall Equipment Effectiveness (OEE) dan Six Big Losses pada CV. ABI Surabaya. Industrial View, 4, 31–39.
Yaqin, A. (2018). Analisis kerja mesin injection moulding dengan metode Overall Equipment Effectiveness (OEE) dan Failure Mode and Effects Analysis (FMEA). pp. 8–40.













